Note: Segments with less than ten votes cast are adjusted to cap each vote at 1% of the industry vote.
Purpose/Industry Need: Determine facility ratings, system operating limits, and transfer capabilities necessary to plan and operate the bulk electric system within predefined facility and operating limits such that cascading outages, uncontrolled system separation, and voltage and transient instability are avoided.
Draft 9
FAC-010, FAC-011, FAC-014 - clean
FAC-010, FAC-011, FAC-014 - redline
TOP-004 - redline to Version 0
Implementation Plan - clean
Implementation Plan - redline
WECC Regional Differences (revised)
10/13/2006 - 10/23/2006(closed)
9/19/2006 - 9/29/2006
(closed)
Consideration of Comments>>
8/18/2006 - 9/18/2006
Draft 8
TOP-002, TOP-004 - redline to Version 0
WECC Regional Differences
6/15/2006 - 7/14/2006
Comments Received>>
Draft 7
Draft 7, FAC-010, FAC-011 - Clean
Implementation Plan - Draft 1 - Redline
Implementation Plan - Draft 1 - Clean
Ballot Period
3/21-30/2006
2/17/2006 - 3/20/2006
Standard Draft 6 FAC-010-1 (to 1st ballot) - Redline
Standard Draft 6 FAC-011-1 (Modified following 1st ballot)
Standard Draft 6 FAC-011-1 (to 1st ballot) - Redline
12/1/2005 - 1/17/2006
Standard Draft 5 - Clean
Standard Draft 5 - Redline
Proposed Implementation Plan
Standard Draft 4
Standard Draft 4 - Redline
WECC Regional Difference
V0 Standards Recommended for Retirement or Revision
6/1/2005 - 7/15/2005
Standard Draft 3
Executive Summary
Supporting Reference for Identification of Interconnection Reliability Operating Limits
2/18/2005 - 4/4/2005
12/1/2003 - 1/21/2004
7/1/2003 - 8/29/2003
12/13/2002 - 1/31/2003
9/24/2002 - 10/25/2002
SAR Draft 1
4/2/2002 - 5/3/2002