1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

This report contains the ERO analyses of the Blue Cut Fire, a system disturbance that occurred in the Southern California area on August 16, 2016. This report was prepared by a NERC/WECC joint task force that was assembled by the NERC Operating Committee (OC) to analyze this disturbance, determine the causes, and develop key findings and recommendations to ensure that occurrences such as this one are mitigated throughout the North American BPS.

 
  
  
  
1200_MW_Fault_Induced_Solar_Photovoltaic_Resource_Interruption_Final.pdf1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report6/8/2017