Reliability Standard Audit Worksheets (RSAWs)
 
expand Header : Archived RSAWs ‎(6)
2011 RSAWs.zip2011 Complete SetReliability Standard Audit Worksheet - Complete Set for 2011 Actively Monitored List1/25/2011
2013 RSAWs.zip2013 Complete SetReliability Standard Audit Worksheet - Complete Set for 2013 Actively Monitored List1/10/2014
Reliability Standard Audit Worksheet - Complete set for 2019 Actively Monitored list.zip2019 Complete SetReliability Standard Audit Worksheet - Complete set for 2019 Actively Monitored list 6/18/2019
expand Header : Current RSAWs for Use ‎(204)
RSAW BAL-001-2_2016_v1.docxBAL-001-2Real Power Balancing Control Performance5/16/2016
RSAW BAL-002-2(i)_2014_v6.docxBAL-002-2(i)Disturbance Control Performance - Contingency Reserve for Recovery from a Balancing Contingency Event8/22/2018
RSAW BAL-003-1.1_2018_v1.docxBAL-003-1.1Frequency Response and Bias Settings3/22/2018
RSAW BAL-005-0.2b May 2013.docxBAL-005-0.2b Automatic Generation Control5/20/2013
RSAW BAL-006-2 September 2011.docxBAL-006-2Inadvertent Interchange10/16/2011
RSAW CIP-003-8_2019_v1.docxCIP-003-8Cyber Security — Security Management Controls3/12/2020
RSAW CIP-004-6_2015_v1.docxCIP-004-6Cyber Security - Personnel & Training  5/8/2015
RSAW CIP-005-5_2015_v1.docxCIP-005-5Cyber Security - Electronic Security Perimeter(s)5/8/2015
RSAW CIP-005-7_2022_v1.docxCIP-005-7CIP-005-7 – Cyber Security – Electronic Security Perimeter(s)9/14/2022
RSAW CIP-007-6_2015_v1.docxCIP-007-6Cyber Security - System Security Management5/8/2015
RSAW CIP-008-6_2020_v5.docxCIP-008-6Cyber Security — Incident Reporting and Response Planning11/3/2020
RSAW CIP-010-2_2015_v1.docxCIP-010-2Cyber Security – Configuration Change Management and Vulnerability Assessments5/8/2015
RSAW CIP-010-4_2022_v1.docxCIP-010-4CIP-010-4 – Cyber Security – Configuration Change Management and Vulnerability Assessments9/14/2022
RSAW CIP-011-3_2022_v1.docxCIP-011-3CIP-011-3 – Cyber Security – Information Protection11/14/2022
RSAW_CIP-012-2_2024_v1.docxCIP-012-2Cyber Security – Communications between Control Centers10/23/2024
RSAW CIP-013-2_2022_v1.docxCIP-013-2CIP-013-2 – Cyber Security – Supply Chain Risk Management9/14/2022
RSAW CIP-014-3_2022_v1.docxCIP-014-3Physical Security7/19/2022
RSAW COM-001-3_2015_v3.docxCOM-001-3 Communications6/12/2017
RSAW EOP-001-2.1b_2013_v1.2.docxEOP-001-2.1bEmergency Operations Planning8/9/2013
RSAW EOP-003-2_2013_v1.docxEOP-003-2Load Shedding Plans10/13/2012
RSAW EOP-004-3_2016_v1.docxEOP-004-3Event Reporting12/19/2016
RSAW EOP-005-2_2013_v1.4.docxEOP-005-2System Restoration from Blackstart Resources12/22/2015
RSAW EOP-006-2_2013_v1.2.docxEOP-006-2System Restoration Coordination7/17/2013
RSAW EOP-008-1_2013_v1.2.docxEOP-008-1Loss of Control Center Functionality10/13/2012
RSAW EOP-010-1_2015_v2.docxEOP-010-1Geomagnetic Disturbance (GMD) Operations5/13/2015
RSAW EOP-011-2_2023_v2.docxEOP-011-2Emergency Operations2/24/2023
RSAW EOP-012-2_2024_v1.docxEOP-012-2Extreme Cold Weather Preparedness and Operations8/23/2024
RSAW FAC-001-2_2014_v2.docxFAC-001-2Facility Interconnection Requirements11/23/2015
RSAW FAC-001-4_2023_v1.docxFAC-001-4Facility Interconnection Requirements12/5/2023
RSAW FAC-002-2_2014_v2.docxFAC-002-2Facility Interconnection Studies11/23/2015
RSAW FAC-002-4_2023_v1.docxFAC-002-4Facility Interconnection Studies12/5/2023
RSAW FAC-003-5_2024_v2.docxFAC-003-5Transmission Vegetation Management3/28/2024
RSAW FAC-010-2.1 January 2011.docxFAC-010-2.1System Operating Limits Methodology for the Planning Horizon v21/25/2011
RSAW FAC-011-2 January 2011.docxFAC-011-2System Operating Limits Methodology for the Operations Horizon1/25/2011
RSAW FAC-011-4_2024_v1.docxFAC-011-4System Operating Limits Methodology for the Operations Horizon3/28/2024
RSAW FAC-014-2 January 2011.docxFAC-014-2Establish and Communicate System Operating Limits1/25/2011
RSAW INT-004-3.1_2018_v1.docxINT-004-3.1Dynamic Transfers3/22/2018
RSAW INT-006-5_2021_v1.docxINT-006-5Evaluation of Interchange Transactions3/18/2021
RSAW INT-009-3_2021_v1.docxINT-009-3Implementation of Interchange3/18/2021
RSAW INT-011-1_2014_v1.docxINT-011-1Intra-Balancing Authority Transaction Identification8/29/2014
RSAW IRO-001-4_2014_v4.docxIRO-001-4Reliability Coordination – Responsibilities11/3/2016
RSAW IRO-002-4_2014_v4.docxIRO-002-4Reliability Coordination – Monitoring and Analysis11/3/2016
RSAW IRO-002-6 v1.docxIRO-002-6Reliability Coordination – Monitoring and Analysis12/18/2019
RSAW IRO-003-2_March 2014.docxIRO-003-2Reliability Coordination - Wide-Area View3/20/2014
RSAW IRO-005-3.1a (May 2013).docxIRO-005-3.1aReliability Coordination - Current-Day Operations5/20/2013
RSAW IRO-006-EAST-2_2016_v1.docxIRO-006-EAST-2Transmission Loading Relief Procedure for the Eastern Interconnection3/31/2016
RSAW IRO-008-2_2014_v5.docxIRO-008-2Reliability Coordinator Operational Analyses and Real-time Assessments11/3/2016
RSAW IRO-009-2_2015_v2.docxIRO-009-2Reliability Coordinator Actions to Operate Within IROLs12/22/2015
RSAW IRO-010-2.docxIRO-010-2 Reliability Coordinator Data Specification and Collection10/13/2016
RSAW IRO-010-4_2023_v1.docxIRO-010-4Reliability Coordinator Data Specification and Collection2/14/2023
RSAW IRO-014-1 (January 2011).docxIRO-014-1Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators10/13/2012
RSAW IRO-015-1 (January 2011).docxIRO-015-1Notifications and Information Exchange Between Reliability Coordinators1/25/2011
RSAW IRO-017-1_2017_v4.docxIRO-017-1Outage Coordination3/10/2017
RSAW MOD-001-1a (September 2011).docxMOD-001-1aAvailable Transmission System Capability10/16/2011
RSAW MOD-008-1 (September 2011).docxMOD-008-1Transmission Reliability Margin Calculation Methodology10/16/2011
RSAW MOD-012-0 (January 2011).docxMOD-012-0Dynamics Data for Transmission System Modeling and Simulation1/25/2010
RSAW MOD-017-0.1 (January 2011).docxMOD-017-0.1Aggregated Actual and Forecast Demands and Net Energy for Load1/25/2011
RSAW MOD-019-0.1 (January 2011).docxMOD-019-0.1Forecasts of Interruptible Demands and DCLM Data1/25/2011
RSAW MOD-021-1 (September 2011).docxMOD-021-1Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts10/16/2011
RSAW MOD-026-1_2014_v2.docxMOD-026-1Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions9/27/2018
RSAW MOD-028-2 October 2013.docxMOD-028-2Area Interchange Methodology10/10/2013
RSAW MOD-029-2a_2016_v1.docxMOD-029-2aRated System Path Methodology11/3/2016
RSAW MOD-030-3_2016_v1.docxMOD-030-3Flowgate Methodology11/7/2016
RSAW MOD-031-3_2021_v1.docxMOD-031-3Demand and Energy Data3/18/2021
RSAW MOD-033-1_2017_v1.docxMOD-033-1 Steady-State and Dynamic System Model Validation4/7/2017
RSAW NUC-001-2.1_April_2014.docxNUC-001-2.1Nuclear Plant Interface Coordination4/24/2014
RSAW NUC-001-4_2021_v1.docxNUC-001-4Nuclear Plant Interface Coordination3/18/2021
RSAW PER-003-1_2013_v1.docxPER-003-1Operating Personnel Credentials1/23/2013
RSAW PER-004-2 (September 2011).docxPER-004-2Reliability Coordination - Staffing10/16/2011
RSAW PER-006_1_2021_v1.docxPER-006-1Specific Training for Personnel3/18/2021
RSAW PRC-002-2_2016_v4.docxPRC-002-2Disturbance Monitoring and Reporting Requirements2/19/2016
RSAW PRC-004-4(i)_2016_v3.docxPRC-004-4(i)Protection System Misoperation Identification and Correction3/31/2016
RSAW PRC-004-6_2021_v1.docxPRC-004-6Protection System Misoperation Identification and Correction3/18/2021
RSAW PRC-005-2(i)_2014_v1.1.docxPRC-005-2(i)Protection System Maintenance5/16/2016
RSAW PRC-006-3_2017_v1.docxPRC-006-3Automatic Underfrequency Load Shedding11/29/2017
RSAW PRC-008-0 (January 2011).docxPRC-008-0Underfrequency Load Shedding Equipment Maintenance Programs1/25/2011
RSAW PRC-010-2_2017_v2.docxPRC-010-2Undervoltage Load Shedding3/10/2017
RSAW PRC-012-2_2020_v1.docxPRC-012-2Remedial Action Schemes10/23/2020
RSAW PRC-015-1_2016_v1.docxPRC-015-1Remedial Action Scheme Data and Documentation11/3/2016
RSAW PRC-016-1_2016_v1.docxPRC-016-1Remedial Action Scheme Misoperations11/3/2016
RSAW PRC-017-1_2016_v1.docxPRC-017-1Remedial Action Scheme Maintenance and Testing11/3/2016
RSAW PRC-019-2_2016_v1.docxPRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection3/31/2016
RSAW PRC-022-1 (January 2011).docxPRC-022-1Under Voltage Load Shedding Program Performance1/25/2011
RSAW PRC-023-3_2014_v1.docxPRC-023-3Transmission Relay Loadability8/29/2014
RSAW PRC-023-6_2024_v1.docxPRC-023-6Transmission Relay Loadability3/28/2024
RSAW PRC-024-3_2022_v1.docxPRC-024-3Frequency and Voltage Protection Settings for Generating Resources10/14/2022
RSAW PRC-026-1.docxPRC-026-1Relay Performance During Stable Power Swings9/25/2017
RSAW PRC-027-1_2019_v1.docxPRC-027-1Coordination of Protection System Performance During Faults6/18/2019
RSAW TOP-001-3_2017_v6.docxTOP-001-3Transmission Operations5/24/2017
RSAW TOP-001-5_2021_v1.docxTOP-001-5Transmission Operations3/18/2021
RSAW TOP-002-2.1b_March 2014.docxTOP-002-2.1b Normal Operations Planning3/20/2014
RSAW TOP-002-5_2024_v4.docxTOP-002-5Operations Planning8/23/2024
RSAW TOP-003-3.docxTOP-003-3Operational Reliability Data10/13/2016
RSAW TOP-003-5_2023_v1.docxTOP-003-5Operational Reliability Data2/14/2023
RSAW TOP-004-2_September_2011.docxTOP-004-2Transmission Operations10/16/2011
RSAW TOP-006-2_March 2014.docxTOP-006-2Monitoring System Conditions3/20/2014
RSAW TOP-008-1 (January 2011).docxTOP-008-1Response To Transmission Limit Violations1/25/2011
RSAW TPL-001-0.1 (January 2011).docxTPL-001-0.1System Performance Under Normal Conditions1/25/2011
RSAW TPL-001-5.1_2023_v1.docxTPL-001-5.1Transmission System Planning Performance6/5/2023
RSAW TPL-003-0b_March 2014.docxTPL-003-0bSystem Performance Following Loss of Two or More Bulk Electric System Elements (Category C)3/20/2014
RSAW TPL-007-4_2020_v2.docxTPL-007-4Transmission System Planned Performance for Geomagnetic Disturbance Events6/7/2022
RSAW VAR-001-5_2018_v1.docxVAR-001-5Voltage and Reactive Control1/3/2019
expand Header : Resource Documents ‎(2)
RSAW Feedback Form.docxRSAW Feedback Form5/1/2012