Related Files
Status
A 35-day formal comment period for draft one of MOD-033-3 Steady-State and Dynamic System Model Validation is open through 8 p.m. Eastern, Wednesday, May 21, 2025.
Ballot pools are being formed through 8 p.m. Eastern, Monday, April 28, 2025.
Initial ballots for the standard and implementation plan, as well as a non-binding poll of the associated Violation Risk Factors and Violation Severity Levels will be conducted May 12-21, 2025.
Background
The Federal Energy Regulatory Commission (FERC) issued Order No. 901 on October 19, 2023, which includes directives on new or modified NERC Reliability Standard projects. Order No. 901 addresses a wide spectrum of reliability risks to the grid from the application of inverter-based resources (IBR), including both utility scale and behind-the-meter or distributed energy resources. Within the Order, are four milestones that include sets of directives to NERC. NERC developed a
directive mapping document as part of its
workplan to address all aspects of Order No. 901. The
Milestone 3 projects will address deficiencies within the current state of model quality.
Project 2021-01 addresses Model Validation of
both steady-state and dynamic system models against actual system behavior.
To facilitate the development of this Milestone, Standard Authorization Requests were assigned to active projects that already had some aspects of Order No. 901-directed modeling improvements and drafting team familiarity with the Reliability Standards to be changed. Project 2021-01 Modifications to MOD-025 and PRC-019 will resume upon completion of this Milestone 3 project.
All Milestone 3 projects must be filed with FERC by November 4, 2025, with full implementation by January 1, 2030, to comply with Order No. 901.
Standard(s) Affected – MOD-033-2 Steady-State and Dynamic System Model Validation
Purpose/Industry Need
The proposed revisions to MOD-033-2 are described in the SAR.
Subscribe to this project's observer mailing list
Select "NERC Email Distribution Lists" from the "Service" drop-down menu and specify “Project
2021-01 System Model Validation with IBRs" in the Description Box.