Project 2023-02 Analysis and Mitigation of BES Inverter-Based Resource Performance Issues

​​​​​​​​​​​​​​​​​​​ Related Files​

Status

A formal comment period for draft three of PRC-030-1 Unexpected Inverter-Based Resource Event Mitigation is open through 8 p.m. Eastern, Monday, August 12, 2024​. 

Additional ballots for the standard and implementation plan, as well as the non-binding poll of the associated Violation Risk Factors and Violation Severity Levels will be conducted August 2-122024.​

This will be the last opportunity for NERC to ballot these projects through traditional mechanisms. The Board may take requisite action during the August Board meeting to ensure directives are met.

The Standards Committee approved waivers to the Standards Process Manual at their December 2023 meeting. These waivers were sought to allow for reduced formal comment and ballot periods to assist the drafting team in expediting the process, due to firm timeline expectations set by FERC Order 901. FERC Order 901 was issued under Docket No. RM22-12-000 ​on October 19, 2023

To assist industry in this upcoming comment and ballot period, NERC has released a Milestone 2 Summary that provides high-level overview of the current state of the associated projects and their interrelationships. The standard drafting team's considerations of the responses received from the previous comment period are reflected in this draft of the standard.​

Background

Multiple NERC disturbance reports,1 including the Odessa disturbance report,2 have identified the undesired performance of bulk power system (BPS)-connected inverter-based resources (IBRs) during grid faults, and have elaborated on the systemic and significant BPS reliability risks that this undesired performance can pose. IBRs may trip for many different reasons, may cease current injection due to inverter controls, or may have unwanted plant-level controller interactions. These types of issues have been extensively documented in the NERC reports. The resulting unexpected and unwarranted loss of generation poses a significant risk to BPS reliability.

Standard Affected: PRC-004-6​

Purpose/Industry Need
This project addresses the reliability‐related need and benefit by requiring analysis and mitigation of unexpected or unwarranted protection and control operations from inverter-based resources following the identification of such a performance issue. This includes any types of protections or controls that result in abnormal performance issues within the plant, including abnormal performance resulting in anomalous behavior of active power output from the facility during events. Considerations may be needed for legacy facilities, but the root cause analysis of the abnormal performance and determination of any mitigating measures should be conducted. The SAR should be applicable to all Bulk Electric System (BES) inverter-based generating resources, including battery energy storage resources.

These changes will prompt analysis of IBR loss events following grid disturbances to ensure that facilities are operating in a reliable manner and providing essential reliability services. Mitigating actions will reduce unnecessary IBR tripping or controls issues that result in widespread reduction of power output from these facilities, and will also reduce the possibility of systemic performance issues in the future.

1 https://www.nerc.com/pa/rrm/ea/Pages/Major-Event-Reports.aspx

2 https://www.nerc.com/pa/rrm/ea/Pages/May-June-2021-Odessa-Disturbance.aspx


Subscribe to this project's observer mailing list
Select "NERC Email Distribution Lists" from the "Service" drop-down menu and specify “Project 2023-02 Analysis and Mitigation of BES Inverter-Based Resource Performance Issues​" in the Description Box.

Draft Actions Dates Results Consideration of Comments

Draft 3

PRC-030-1​

Clean | Redline ​to Last Posted​​

Implementatio​n Plan​

Clean | Redline to Last Posted

 

Supporting Materials

Technical Rationale​

Clean | Redline to Last Posted​​​

Unofficial Comment Form​

VRF/VSL Ju​stifications​

Mapping Document​


Additional Ballots


Info

Vote



8/2/24 - 8/12/24

​Comment Period 


Info

Submit Comments​​



​7/22/24 - 8/12/24

Draft 2

PRC-030-1​

Clean | Redline to Last Posted​​

Implementatio​n Plan​

Clean | Redline to Last Posted

 

Supporting Materials

Technical Rationale​

Unofficial Comment Form​

VRF/VSL Ju​stifications​​​




Additional Ballots

Ballot Open Reminder​

Info

Vote




 7/1/24 - 7/10/24


Ballot Results

 PRC-030-1

 Implementation Plan​

 Non-bindin​g Poll Results​​














Consideration of Comments

​Comment Period 

Info

Submit Comments​​



​6/7/24 - 7/10/24



​​
Comments Received​

​Draft 1

PRC-030-1

Implementation Plan​

 

Supporting Materials

Technical Rationale​

Unofficial Comment Form

VRF/VSL Justifications​​​

Initial Ballot

Ballot Open Reminder​

Info

Vote
​​​​​​​​


4/9/24 - 4/18/24

Ballot Results





































Consideration of Comments


Join Ballot Pools

Ballot Pool Reminder​

3/25/24 - 4/3/24
​Comment Period

Inf​o​

Submit Comments​​


​3/25/24 - 4/18/24


Comments Received​​​
Waiver​​​
Standards Committee accepted the waiver on December 13, 2023.​​​​12/13/2023​
​​Standard Authorization Request
Clean​ | Redline​

Accepted by the Standards Committee


8/23/2023

Drafting Team Nominations

Supporting Materials

 Unofficial Nomination Form (Word)​

Nomination Period

Info

Submit N​om​inations​



2/22/2023 - 3/23/2023




​Supporting Materials

Unofficial Comment Form (Word)

​Comment Period

Info​​


Submit Comments


2/22/2023 - 3/23/2023​




Consideration of Comments​