Status:
As of July 28, 2010 this project has been merged with Project 2007-18 - Reliability-based Controls and is now Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves. The new project page is available at: Project 2010-14.1 Phase 1 of BARC: Reserves
Purpose/Industry Need:
The purpose of this set of four standards is to ensure that Balancing Authorities take actions to maintain interconnection frequency with each Balancing Authority contributing its fair share to frequency control and without burdening transmission facilities with excessive imbalances of load and generation.
This SAR is intended to address the following:
- FERC Final Rule “Mandatory Reliability Standards for the Bulk-Power System, FERC Order 693” on the NERC standards BAL-002, 004, 005, and 006
- To specify the Time Error Correction, special Area Control Error cases, and Inadvertent Interchange reliability requirements/business practices with NERC and NAESB collaborative participation
- To incorporate the necessary content, structure, and language to comply with the NERC standards process
This SAR expands on the work already under way with the BAL-004, 005, 006 SARs, by requiring that BAL-002, 004, 005, and 006 be upgraded in accordance with the NERC Reliability Standards Development Plan 2007–2009.
Draft |
Action |
Dates |
Results |
Consideration of Comments |
As of July 28, 2010 this project has been merged with Project 2007-18 - Reliability-based Controls and is now Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves
The new project page is available at: Project 2010-14.1 Phase 1 of BARC: Reserves |
Survey on Time Error Correction
Supporting Materials:
|
Info>>
|
9/12/2008 - 10/13/2008 (closed) |
|
Consideration o f Comments>> |
|
Balancing Authority Controls Standard Drafting Team Nominations
Draft SAR Version 2
|
Nomination Period
Info>> Submit Nomination>> |
1/2/2008 - 1/15/2008 (closed) |
|
|
Balancing Authority Controls SAR Drafting Team Nominations |
Nomination Period
Info>> Submit Nomination>>
|
7/17/2007 - 7/30/2007 (closed) |
|
|
|
Draft SAR Version 1
Balancing Authority Controls
|
Comment Period
Info>> Submit Comments>> |
7/3/2007 - 8/1/2007 (closed) |
Comments Received>> |
Consideration of Comments>> |
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice. |