Related Files Status:
The Board of Trustees adopted these FAC standards on June 24, 2008 and are pending regulatory approval.
Purpose/Industry Need:
The purpose of revising these standards is a result of:
FERC Order 705, the Commission directed NERC to make the following modifications:
- FAC-011-1 Requirement R2.3.2 — eliminate the phrase, “load greater than studied”
- Replace levels of non-compliance with Violation Security Levels
In addition, the Commission remanded the definition of “Cascading Outage” and this term should be withdrawn from the NERC Glossary of Reliability Terms.
Draft |
Action |
Dates |
Results |
Consideration of Comments |
Facility Ratings Standards
Implementation Plan Clean |
Posted for Board of Trustees Adoption |
June 24, 2008 |
|
|
|
Facility Ratings Standards
Implementation Plan Clean |
Recirculation Ballot
Info>> |
6/13/2008 – 6/22/2008 (closed) |
|
|
|
Facility Ratings Standards
Note that in the version of FAC-011-2 that was posted for pre-ballot review, there was an error in the initial sentence of the Severe Violation Severity Level for Requirement R3 that has now been corrected as follows:
The Reliability Coordinator has a methodology for determining SOLs that is missing a description of three four or more of the following: R3.1 through R3.7.
Implementation Plan Clean |
Initial Ballot Window
Info>> |
6/2/2008 – 6/11/2008 (closed) |
Summary>>
Full Record>> |
|
|
Final SAR Version 2 and Facility Ratings Standards
Final SAR Version 2 Clean
Implementation Plan Clean |
Info>> |
|
|
|
|
Draft SAR Version 2 and Facility Ratings Standards
|
Comment Period
|
3/31/2008 - 4/29/2008
(closed)
|
|
Consideration of Comments>> |
|
Draft SAR Version 1 Facility Ratings Standard
|
Comment Period
|
1/24/2008 - 3/07/2008 (closed)
|
|
Consideration of Comments>> |
To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice. |